|
How Insituform® CIPP is Installed
Click on the links below to view an animation of the Insituform® cured-in-place pipe (CIPP) process.
Insituform® CIPP Click here to view animation (7MB wmv)
The Process 1. A resin-saturated, coated felt tube is inverted (left) or pulled (right) into a damaged pipe.

2. Next, hot water or steam is used to cure the resin and form a tight-fitting, jointless and corrosion-resistant replacement pipe.
 3. We restore service laterals internally with robotically controlled cutting devices, inspect the rehabilitated pipe by closed-circuit TV.
Access the current CIPP brochure in US and metric measurements here.
|